Main Menu

Empire of Japan 1900-2

Started by Darman, February 28, 2013, 10:14:18 PM

Previous topic - Next topic

Darman


Empire of JapanPopulationBPICRevenueNext IC
Home Islands42229013294.44
Taiwan3.101619.170.44
0000
0000
0000
0000
0000
Total:45.122106151.1
Do not write into grey cells, those values are calculated!
$BP
Other Income8.68carryover
Total Budget:159.78
Army Construction:00
Army Maintenance:12.6010
Army Ammo Consumption00
Aircraft Infrastructure00
Aircraft Constr/Repair0
Aircraft Maintenance00
Navy Construction&Repair16.207520.25
Navy Maintenance:9.190
Research:1.25Maximum:$81/3 BP+
Military Infrastructure$0 0
Naval Infrastructure$15 1.75
Coast Artillery Maintenance0.5250
Carryover
Other Expenses5$2.00 on black operations in Korea and Mainland China, $2 on black operations in Manchuria, $1 on counter-intel in Japan
Military Budget59.7722Maximum:$79.89
Industry profits0Unused BP
Social Programs5Program to encourage Japanese families to have more children
Economic Dev.:95.01$95.01 for a new BP (start cost: $210.00/remaining: $114.99)
95.01
Merchant Marine
Maximum Size:
Advancement
Research
8"/45 barrel0-6 months24 months$0.25 per turn
Twin turret/barbette 8"/45 mount0-6 months12 months$0.50 per turn
(same ring as twin 8"40)
Twin turret/barbette 8"/40 mount0-6 months12 months$0.50 per turn
Digestion
Stockpiles




Total Upkeep:$9.19fightingW: ship is actively fighting, empty otherwise
The 'Upkeep' column is calculated by the respective letter signifying the status- any other entry (not 'a' 'r' or 'm') will result in 0
#CountName/ClassDispLD/Com/R.v_MaxRangeCruiseBunkerStatusfightingUpkeep [$]LocationNotes
BB011Fuji1173496/96184000101279m0.542South Approach Squ
BB021Hotaka/Fuji1173496/96184000101279m0.542South Approach Squ
BB031Ena/Fuji1173496/96184000101279m0.542Taiwan Squseconded to South Approaches Squ
BB041Kiragamine/Fuji1173496/96184000101279m0.542Taiwan Squseconded to South Approaches Squ
BB051Asahi1292999/99189000102886m0.572Home Squseconded to South Approaches Squ
BB061Shiki/Asahi1292999/99189000102886m0.572Home Squseconded to South Approaches Squ
CA011Asama851797/9720.57000101804a0.312Home Squ
CA021Tokiwa/Asama851797/9720.57000101804a0.312East Approach Squ
CA031Hikari/Asama851797/9720.57000101804m0.460South Approach Squ
PC011Yoshino410092/92216000101125a0.178Marianas Is Squ
PC021Nara/Yoshino410092/92216000101125m0.290East China Squseconded to South Approaches Squ
PC031Kashiba/Yoshino410092/92216000101125m0.290South Approach Squ
PC041Uda/Yoshino410092/92216000101125a0.178Taiwan Squ
PC051Ikoma/Yoshino410092/92216000101125a0.178Taiwan Squ
PC061Sakurai/Yoshino410092/92216000101125m0.290Kurile Is Squ
PC071Suma346696/9621450010701a0.149East China Squ
PC081Akashi/Suma346696/9621450010701m0.243East Approach Squseconded to Taiwan Squ
PC091Tamba/Suma346696/9621459910701m0.239East Approach Squseconded to Taiwan Squ
RG011Sumida14399/991025085m0.012South Approach Squ
RG021Fushimi/Sumida14399/991025085a0.007Taiwan Squ
RG031Okitsu/Sumida14399/991025085m0.012South Approach Squ
RG041Karatsu/Sumida14399/991025085m0.012South Approach Squ
RG051Katada/Sumida14399/991025085m0.012North Approach Squ
MW11#1 (Yaeyama)50000/0026.52,0001091m0.086Kurile Is Squsea trials until end of Sept
MW21#2 (Yaeyama)50000/0026.520001091m0.086Taiwan Squsea trials until end of Sept
DD9501-055Akikaze49995/9524.25250010125m0.395Kurile Is Squ
DD9506-105Akikaze49995/9524.25250010125a0.195Taiwan Squ
DD9511-155Akikaze49995/9524.25250010125m0.395Sea Japan Squ
DD9801-055Kamikaze49998/9824.5250010119m0.386East China Squ
DD9806-105Kamikaze49998/9824.5250010119m0.386Home Squseconded to South Approaches Squ
DD9811-155Kamikaze49998/9824.5250010119m0.386Home Squseconded to South Approaches Squ
DD9816-205Kamikaze49998/9824.5250010119m0.386North Approach Squ
SS 011A Class23800/00101000614m0.012North Approach Squworking up
SS 021A Class23800/00101000614m0.012North Approach Squworking up
Tonnage:1525239.190




Total:Total:$16.21 Total(BP): 20.250
PortInfrastructureShip Cost Cash spentCash remaining tonnage BP spentBP remainingreadyTimeTotal Build time
Yokosuka (3)Type 3+ Dry Dock (220m/721ft)Kongo (Kongo BB) $13.71 $3.00$0.00 13,707 3.5004.5No7-12 months23 months
Type 1+ Dry Dock (120m/393ft)Chiyoda (Chiyoda PC) $4.02 $0.00$0.00 4,018 2.0000Yes (aug)7-12 months13 months40% complete in July, slip ready by August
Type 0 Slipway (70m/230ft)Taku Maru 1 $0.21 $0.21$0.00 3,000 0.2130No0-3 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 2 $0.21 $0.21$0.00 3,000 0.2130No0-3 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 3 $0.21 $0.21$0.00 3,000 0.2130No0-3 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 4 $0.21 $0.21$0.00 3,000 0.2130No0-3 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 5 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Undocked vessels
Kure (3)Type 2+ Dry Dock (170m/577ft)Akagi (Kongo BB) $13.71 $3.00$0.00 13,707 3.5004.5No7-12 months23 months
Type 1+ Dry Dock (120m/393ft)Saien (Chiyoda PC) $4.02 $0.00$0.00 4,018 2.0000Yes (aug)7-12 months13 months40% complete in July, slip ready by August
Type 0 Slipway (70m/230ft)Taku Maru 6 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 7 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 8 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Undocked vessels
Maizuru (2)Type 2+ Dry Dock (170m/577ft)Hiryu (Kongo BB) $13.71 $3.00$0.00 13,707 4.0004No7-12 months23 months
Type 1+ Dry Dock (120m/393ft)Izumi (Chiyoda PC) $4.02 $0.00$0.00 4,018 2.0000Yes (aug)7-12 months13 months40% complete in July, slip ready by August
Type 0 Slipway (70m/230ft)Taku Maru 9 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 10 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0 Slipway (70m/230ft)Taku Maru 11 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Undocked vessels
Sasebo (2)Type 2+ Dry Dock (170m/577ft)Port Under Construction
Type 1+ Dry Dock (120m/393ft)"  "
Type 0 Slipway (70m/230ft)"  "
Type 0 Slipway (70m/230ft)"  "
Type 0 Slipway (70m/230ft)"  "
Undocked vessels
Tokyo (1)Type 0 Slipway (70m/230ft)Under Construction
Type 0 Slipway (70m/230ft)Taku Maru 12 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Undocked vessels
Iturup Island (1)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Undocked vessels
Taipei City (2)Type 1+ Dry Dock (120m/393ft)Chikuma (Chiyoda PC) $4.02 $4.02$0.00 4,018 0.0633.9555No0-6 months13 months
Type 0+ Dry Dock (70m/230ft)Taku Maru 13 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0+ Dry Dock (70m/230ft)Taku Maru 14 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0+ Dry Dock (70m/230ft)Taku Maru 15 $0.21 $0.21$0.00 3,000 0.2130No0-6 months12 monthsMerchant Hull5 months in slip
Type 0+ Dry Dock (70m/230ft)Under Construction
Undocked vessels
Magong Island (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Miyakojima Island (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Nago (Ie Island) (1)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Yakushima Island (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Kanazawa (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Niigata (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Wakkanai (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Kagoshima (0)Type 0+ Dry Dock (70m/230ft)
Type 0+ Dry Dock (70m/230ft)
Total $60 $16 $-    102,193 20.25016.9555




Status ValuesM: MobilizedR: Reserve
A:ActiveF: the corps is on an active war front, and is spending ammunition as if there were no tomorrow
Total Army Upkeep:$12.60Total ammo consumption:0
(without ammo cost)(Both in $ and BP!)
Ammo Cons.
CorpsNameType StrengthMoraleRatingArtilleryStatusUpkeepLocationNotes
IINF100Elite42m 0.80 0.0Tokyo
IIINF100Elite42m 0.80 0.0ScatteredIn Brigade Garrison units
IIIINF100Reg42a 0.40 0.0Taipei City
IVINF100Reg42m 0.80 0.0Taiwan
VINF100Reg42m 0.80 0.0Hokkaido
VIINF100Reg42m 0.80 0.0Kyushi
VIIReserveINF100Reserve31m 0.60 0.0ScatteredIn Brigade Garrison units
VIIIReserveINF100Reserve31m 0.60 0.0Honshu
IXReserveINF100Reserve31m 0.60 0.0Shikoku
ICAV100Reg41m 0.80 0.0Honshu
IICAV100Reg41a 0.40 0.0Taiwan
IMAR100Reg41m 0.80 0.0Hokkaido
IMTN100Reg41m 0.80 0.0Kyushi
IIReserveMTN100Reserve30.5m 0.60 0.0Honshu
IPurposeType100MoraleRatingArtilleryStatusUpkeepAmmo C.
Naval BaseFort100Reg0.6671a0.1330.0Yokosuka City
Naval BaseFort100Reg0.6671a0.1330.0Kure
Naval BaseFort100Reg0.6671a0.1330.0Sasebo
Naval BaseFort100Reg0.6671a0.1330.0Maizuru
CapitolFort100Reg23a0.4000.0Tokyo
Naval BaseFort100Reg23a0.4000.0Taipei City
Coast DefenseFort100Reg0.6671m0.2670.0Magong Island
Coast DefenseFort100Reg0.6671m0.2670.0Iturup IslandKurile Is. Defense Force
Coast DefenseFort100Reg0.6671m0.2670.0Kanazawa
Coast DefenseFort100Reg0.6671m0.2670.0Niigata
Coast DefenseFort100Reg0.6671m0.2670.0Wakkanai
Coast DefenseFort100Reg0.6671a0.1330.0Kagoshima
1stBatterySiege100Elite0.51m0.2000.0Tokyo




ActiveX/80Turret MountedTM
ReserveX/400
Location# of gunsCaliberMountDefensesStrengthMoraleCost ($/BP)StatusUpkeep
Yokosuka412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Kure412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Sasebo412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"40TMnone100Reg0.48m0.0120
Maizuru412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Tokyo412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Iturup Island212"/35DMnone100Reg0.34m0.0085
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Taipei City412"/35DMnone100Reg0.68m0.0170
48"/40CMnone100Reg0.32m0.0080
66"/40TMnone100Reg0.48m0.0120
Magong Island66"/40TMnone100Reg0.48m0.0120
10210.50.2625




NavalCash$15 BP1.75
ArmyCash$0 BP0
Naval Infrastructure Projects
LocationCash CostCash SpentCash LeftBP CostBP SpentBP LeftProject description
Sasebo$15 $6 $9 10.0750.925From Port Type 2 to Port Type 3
Tokyo$6 $3 $0 10.6750Upgrading Slipway Type 0 to Slipway Type 1
Taipei City$6 $6 $0 110Upgrading Slipway Type 0 to Slipway Type 2
Total$15 1.75
Army Infrastructure Projects
LocationCash CostCash SpentCash LeftBP CostBP SpentBP LeftProject description
$0 0
Total$0 0