Gran Colombia, H2/15

Started by The Rock Doctor, January 11, 2009, 03:49:06 PM

Previous topic - Next topic

The Rock Doctor

GRAN COLOMBIA:  SECOND HALF REPORT, 1915

Area:   Population:          BP:         IC:           Revenue
Heartland36.832 million20.0  89.0125.83
Antilia Mayor  8.656 million  4.5  22.0  30.66
Antilia Menor*  0.765 million  0.0   1.0   1.77
Guayana Francesa  0.300 million  0.0   1.0   1.30
Amazonas del Sur  1.326 million  0.5    3.0   4.33
Coquimbo  0.333 million  0.0    1.0   1.33
Territorios de Pacifico Colombiano**      0.036 million  0.0   0.0   0.00
Total48.248 million25.0117.0165.22

*Includes ex-French islands
**Cook Islands, eastern Samoa, Galapagos, Line, and Marquesa Islands


Additional Income/Expenditures:
    +$2.40C and $2.40M from Iberia (royalty)
    +$1.80C and $1.80M from Japan (royalty)
    +$12M from China for tech
    +$3 M from Iberia (loan)
    -$5.00M to Russia (AC construction)
    -$4.2M and $3C to Bavaria (Ship component construction, built to GC standards, and railway stuff)
    +6,000 t from Bavaria (Hull parts - AC Avenger, Tirador)
    +2 BP of railway stuff from Bavaria
    -$2M and $2C to Italy
    +$40C from Iberia (buying out 1st IC in Brazil)
    -$40C, invested in IC in NEI

Status:  Peace time, with limited mobilization. 

Total Budget (maximum military budget):  $90.61 military and $81.81 civilian, plus 26 BP, 6,000 t in ship parts, and 2 BP of railway stuff.

A.  NAVAL OPERATIONS:

Armada Maintenance Requirements:  $9.78
    -Begin rebuilding BB Resulto as target ship:  $1.05, 0.269 BP
    -Add DC, replace torps/wireless on J-class torpedo-boats:  $0.30, 0.126 BP
    -Overhaul CP Casanare, add aircraft launching ramp:  $0.30, 0.100 BP

Existing Armada Construction Requirements:

    -BB-17, Radiante, underway at Cartagena:  $4.705, 4.707 BP
    -BB-18, Brillante, underway at Cartagena:  $4.705, 4.707 BP
    -BM-01, Sucre, underway at Esmeraldas:  $3.48, 3.480 BP
    -AC-14, Arquero:  Ordnance manufactured for shipment to Russia:  $0.65, 0.645 BP
    -TB-120, Salamanca, underway at La Guaira:  $0.50, 0.400 BP, completed end of October
    -TB-121, Sewell, underway at Montego Bay:  $0.50, 0.400 BP, completed end of October
    -TB-122, Santa Rita, underway at Esmeraldas:  $0.50, 0.400 BP, completed end of October
    -Espiritu de Neuvo Granada, underway at Cartagena:  $2.38, 0.260 BP, completed end of July*
    -Spirit of the Island Commonwealth, underway at Cromwell:  $2.38, 0.260 BP, completed end of July*
    -AT-05, Regulo, underway at Cartagena:  $0.12, 0.114 BP, completed end of October*
    -SS-26, Sabalo, underway at Ciudad Jorge :  $0.40, 0.200 BP, completed end of October
    -SS-27, Arowana, underway at Colon:  $0.40, 0.200 BP, completed end of October
    -SS-28, Caiman, underway at San Miguelito:  $.40, 0.200 BP, completed end of October
    -SS-29, Aguja, underway at Colon  :  $1.10, 0.400 BP
    -SS-30, Octopoda, underway at La Guaira  :  $1.10, 0.400 BP
    -CP-35, Arauca, underway at Montego Bay:  $0.97, 0.970 BP, completed end of September
    -CP-36, Dominica, underway at La Guaira:  $0.97, 0.970 BP, completed end of September
    -PC-34, Combarbala, underway at San Miguelito:  $0.095, 0.094 BP, compelted end of October*
    -PC-35, Ovale, underway at San Miguelito:  $0.095, 0.094 BP, completed end of October*
    -APA-05, Senora Eva, underway at Cartagena:  $0.25, 0.249 BP, completed end of September*
    -APA-07, Senora Salma, underway at Colon:  $0.50, 0.500 BP*
    -IX-07, Santander, underway at Manaus:  $0.10, 0.098 BP*
    -Egyptian Cruiser B, underway at Cartagena:  $2.50, 2.000 BP

New Armada Construction:

    -AC-15, Tirador, laid down at Cartagena:  $1.00, 1.000 BP, 3,000 t of stuff from Bavaria (=$3, 3 BP)
    -AC-16, Avenger, laid down at Cromwell:  $2.69, 1.686 BP, 3,000 t of stuff from Bavaria (= $3, 3 BP)
    -TB-123, Sauriwaunawa, laid down at La Guaira:  $0.75, 0.600 BP
    -TB-124, Samaca, laid down at Montego Bay:  $0.75, 0.600 BP
    -TB-125, Sogamoso, laid down at Esmeraldas:  $0.75, 0.600 BP
    -PC-36, Morichal, laid down at San Miguelito:  $0.095, 0.094 BP*
    -PC-37, La Pedrera, laid down at San Miguelito:  $0.095, 0.094 BP*
    -AM-15, Rio Marouini, laid down at Colon:  $0.10, 0.097 BP*
    -AM-16, Rio Berbice, laid down at La Guaira:  $0.10, 0.097 BP*
    -AT-06, Denebola, laid down at Cartagena: $0.11, 0.114 BP*
    -SS-31, Huaquil, laid down at Ciudad Jorge:  $0.60, 0.300 BP
    -SS-32, Corvina, laid down at Colon:  $0.60, 0.300 BP
    -SS-33, Guitarra, laid down at San Miguelito:  $0.60, 0.300 BP
    -AD-09, Jade, laid down at Montego Bay:  $2.19, 0.300 BP
    -AD-10, Zafiro, laid down at Sam Miguelito:  $2.19, 0.249 BP
    -IX-8, Jose Ignacio de Marquez, laid down at Manaus:  $0.10, 0.098 BP*
    -PB-48 to 51, laid down at various locations:  $0.16, 0.148 BP

B.  LAND OPERATIONS:  $21.80, 0.000 BP

Ejercito Maintenance Requirements:  $18.30

Ejercito Recruitment and Operations Requirements:
    -Manufacture and stockpile six artillery barrages of phosgene:  $3.00

Intelligencio del Ejercito:  $0.50

C.  AERONAUTICAL INFRASTRUCTURE:  $1.60, 0.000 BP

Maintenance:  $0.40

Construction and Repair:
    -New airstrip built at Lionel Town, Jamaica:  $0.50
    -New airstrip built at David, Panama:  $0.50
    -Type 1 Airship A-13 built: $0.20

D.  MILITARY INFRASTRUCTURE:  $5.00, 0.500 BP

Military Infrastructure Construction and Repair:
    -Type 0 Port built at Guantanamo Bay, Cuba:  $5.00, 0.500 BP

E.  RESEARCH AND DEVELOPMENT:  $8.00

Maximum Projects:  $9

Projects:
    -Complete 1910 Aircraft (1914 models): 6th half-year, $1, Done.
    -Continue 1912 Fire Control: 5th half-year, $1
    -Continue 1914 Electric Torpedoes: 3rd half-year, $1
    -Complete digesting 1912 TB from Iberia: $0.25
    -Complete digesting 1906 Electric Propulsion from NUS: $0.25
    -Complete digesting 1912 Geared Drives from Peru: $0.25
    -Commence 1915 Light Infantry/Specialist Units: 1st half-year, $1
    -Commence 1910 Reserves (Move units from depots at M+5): 1st half-year, $1
    -Commence 1915 CBR Warfare: 1st half-year, $1
    -commence 1915 Submarines: 1st half-year, $1
    -Commence 37 mm AA Gun:  1st half-year, $0.25

F.  BLACK OPERATIONS:  $2.91

*This is not the section you are looking for*

G.  CIVILIAN INFRASTRUCTURE, ECONOMIC DEVELOPMENT & OTHER STUFF:  $81.91

Infrastructure Development:
    -Undersea telegraph cable laid from Pago Pago to Nuku'alofa (DKB) via Apia, DKB Samoa:  $4, 1.000 BP
    -Commence extension of  railway in Coquimbo by 160 km:  $2.91, 2,000 t of railway stuff (from Bavaria)

Economic Development:
    -Industrial Expansion in Japan:  $75.00 invested (fourth and final IC completed)

Addendum:  Armada Order of Battle, 31/12/15:

A/B + C  = (In Service or Working Up) / (In Reserve/Training) + Under Construction/Repair/Refit

Battleships, BB:  6/2 + 2 (+1 converting to target ship)
Armored Cruiser, CA:  5/1 + 2 (+1 in Russia)
Protected Cruiser, CP:  25/1 + 0
Ocean-going Torpedo Boats, TB:  63/2 + 3
River/Coastal Torpedo Boats, TB:  9/1 + 0
Submarines:  26/2 + 3

Dispatch Boat, TD:  4/0 + 0
Minelayers, TM:  3/0 + 0
Minesweepers, MS:  14/2 + 0
Patrol Sloops and Cutters, PC:  35/0 + 2
River Gunboats, GR:  7/3 + 0
Patrol Boat, PB:  50/0 + 0

Colliers, AC:  5/0 + 0
Transports, AP:  2/0 + 0
Attack Transports, APA:  6/0 + 1 (+1 in Egypt)
Oilers, AO:  4/0 + 0
Depot Ships, AD:  9/0 + 1
Survey Ships, AU:  3/0 + 0
Tugs:  5/0 + 1
Unclassified Ships, IX:  6/0 + 1
Water Tankers, AWT:  1/0 + 0
Government Subsidized Steamships:  2/0 + 0

Coastal Fortresses:  6/0 + 0
Shore Batteries:  22/0 + 0