GTB refits

Started by Sachmle, June 28, 2009, 12:22:21 PM

Previous topic - Next topic

Sachmle

Starting in 1HY/17 the 12 GTB 1909 ships will get DCs added. They currently have 28t of misc weight, but no breakdown was provided by Swamphen. I presume that the breakdown is as follows:
10t SR W/T, 6t 6 1t 50cm Torps. That leaves 12t to use for DCs, therefore I'll use 4t to give them 12 DCs each.
Here's the original SS: http://www.navalism.org/index.php?topic=1231.msg22811#msg22811

Once they're completed (~2 weeks) the 16 GTB 1912 will get similar upgrades. They each have 50t of misc weight, which should be 25t LR W/T and 6t 50cm torps. They will also get 4t worth of DCs.
SS:http://www.navalism.org/index.php?topic=1231.msg24515#msg24515

All told it should cost me 0.11BP and 0.11KM for all of them using the 'functional replacing non-functional misc weight' costs from herehttp://www.navalism.org/index.php?topic=2965.msg30705#msg30705

Once these refits are finished all my newer GTBs will have ASW equipment. Should be by Feb 1917.
"All treaties between great states cease to be binding when they come in conflict with the struggle for existence."
Otto von Bismarck

"Give me a woman who loves beer and I will conquer the world."
Kaiser Wilhelm

"If stupidity were painfull I would be deaf from all the screaming." Sam A. Grim