Ottoman Empire 1913 H2

Started by miketr, January 29, 2009, 02:16:44 PM

Previous topic - Next topic

miketr

Ottoman Empire, July 1913


PopBPICRev
Albana-Macedonia4.50.524.5
Thrace5.962712.96
Anatolia10.862.51020.172
Armenia2.080.251.53.116
Kurdistan1.560.251.53.012
Mesopotamia2.60.52.24.48
Syria3.6413.456.938
Hejaz1.040.251.12.14
Total32.247.2527.7557.318

War Budget: N

Other Income: $-2 to Hapsburgs for "admin" costs of Albana-Macedonia & -0.11 BP roll over from H1
Total Budget: 55.318
Army Maintenance: $11.1
Army Construction: $
Navy Maintenance: $2.83
Navy Construction: $11.05 / 7.14 BP

--Project ID spent this half (already spent / needed to finish)

Build TB-41 to TB 47  $0.9375 & 0.75 BP each for a total of $6.5625 & 5.25 BP

Basic Refit of all 10 Aintab class Gun Boats $2.6

Produce Ammo $1.89 / BP 1.89

Sending to breakers
Destroyers
Sivrihisar
Gairet-I-Watanije
Jadhigar-I-Millet
Muavenet-I-Millet
Numene-I-Hamije
Kocatepe
Tinaztepe
Sakar
Özgültekin



--Ammo Reserve
----BP 7  worth of Ammo (can't be switched)
----$7 worth of Ammo (can't be switched)


Research: $3

--Light Cruiser Architecture
----1910 Cutting Edge (+5): twin gun mounts (h2 1913) (half 1)

--Army Mobilization and Reserves:
----1910 Cutting Edge (+3): can bring units from reserve to active status in seven days.  (h2 1913) (half 1)

--Naval Propulsion
----1909: Engine year 1912, Max. Turbine power 20000HP/Shaft (H1 1911) (half 4)


Finished Tech
--Special Units Weapons (Cavalry/Light&Mountain Infantry Weapons - more
----1905 Advanced (+1) (H2 1910) (half 5) (finished 1913 H1)

--CBR warfare:
----1905 Advanced (+1) (H2 1910) (half 5) (finished 1913 H1)

--Torpedo Technologies
----1899 Baseline (0):3000@26, 1500@30, 100kg warhead(+0 dam.), early wet heater 1t, 18" (H1 1906-H1 1908)

--Internal Combustion Engines (Land, submarines, and air)
----1900 Advanced (+1): Land and airship engines up to 200HP, 50HP aeroplane engines (H1 1906-H1 1908)

--Special Units Weapons (Cavalry/Light&Mountain Infantry Weapons - more mobile than Line INF, with half the Artillery rating)
----1895 Baseline (0) 4/1 (H1 1906-H2 1908)

--Submarines
----Year 1900 (Dated) w/ foreign aid $0.25 H1 1909 (2nd half)

--Naval Artillery Shells
----1905 Advanced (+1): Armour-Piercing  w/ foreign aid $0.25 H1 1909 (2nd half)

--Heavier-than-Air Aircraft
----1902 Advanced: Primitive flying machines: Wright Flyer, Langly Aerodrome etc. 1906 historical year w/ foreign aid $0.25 H2 1909 (2 half)

--Naval Propulsion
----1905 Cutting Edge w/ foreign aid $0.25 H2 1909 (2 half)

--Internal Combustion Engines (Land, submarines, and air)
----1905 Cutting Edge(+3)(H2 1908) (4 half) (done)

--Torpedo Technologies
----1905 Advanced (+1): 5000@26, 2200@35, 100kg warhead, imp. wet heater, 1t, 18" (H2 1908) (5 half)

Other Expenses: $0


Total Military: $

Industrial Investment: $27.338
--21.502 towards IC total: (21.502+53.498 = 75 / 75)
--5.836 towards IC total: 5.836 = 5.836 / 75

In 1914 H2 Hapsburg build IC in Albania-Macedonia another 1.2 goes to Hapsburgs starting in 1915 H1