Greece H1 1915

Started by miketr, January 15, 2009, 08:44:25 PM

Previous topic - Next topic

miketr

Kingdom of the Hellenes, January 1915


Pop       BP         IC         Rev       
Greece5.50.536.5

War Budget: N

Other Income: CSA $1 / Bavaria $2 / Iberia $1 / Hapsburg $21 (towards IC)


Roll over BP: O

Total Budget:  $31.5 + 1 BP

Army Maintenance: $1.25
Army Construction: $2

Navy Maintenance: $0.33 (laid up AC for one half IE in reserve)
Navy Construction: $0
Special Ops: $0

Army Construction
repair of Depot Corps 1 & 2
#1 Need $1 and 0 BP
receive $2 and 0.25 BP
#2 Need $1 and 0 BP
receive $2 and 0.25 BP

Industrial Profits convert 1 BP into $1

(owes Iberia 1 BP)

Research: $1

Naval Artillery Shells
1908 Cutting Edge (+3): Capped shells ($0.25, 1 of 2 Halfs, start 1915-H1)
Torpedo Technologies
1905 Advanced (+1): 5000@26, 2200@35, 100kg warhead, imp. wet heater, 1t, 18" ($0.25, 1 of 2 Halfs, start 1915-H1)
Destroyer and TB architecture
1912: max displacement 1500t ($0.25, 1 of 2 Halfs, start 1915-H1)
Special Units Weapons (Cavalry/Light&Mountain Infantry Weapons - more mobile than Line INF, with half the Artillery rating)
1905 Advanced (+1) 5/1.5 ($0.25, 1 of 2 Halfs, start 1915-H1)


Finished
Engine Tech

Gun Technology
1902 Advanced(+1) (From Iberia) ($0.25, 2 of 2 Halfs, start 1914-H1)
Heavier-than-air crafts
Baseline: None, perhaps a few private experimenters with gliders
1902 Advanced: Primitive flying machines: Wright Flyer, Langly Aerodrome etc. 1906 historical year (From Iberia) ($0.25, 2 of 2 Halfs, start 1914-H1)
Torpedo Technologies
1905 Advanced (+1): 5000@26, 2200@35, 100kg warhead, imp. wet heater, 1t, 18" (From Iberia) ($0.25, 2 of 2 Halfs, start 1914-H1)
Naval Propulsion
1909: Engine year 1912, Max. Turbine power 20000HP/Shaft (From Iberia) ($0.25, 2 of 2 Halfs, start 1914-H1)

1905 Cutting Edge (+3) Engine year 1909, Max. Turbine power 12000HP/Shaft (From Iberia) ($0.25, 2 of 2 Halfs, start 1913-H1)
1906 Oil-firing boilers allows bunkers with larger than 10% percentage for oil (From Iberia) ($0.25, 2 of 2 Halfs, start 1913-H1)
DD - TB Tech
1908 Cutting Edge (+3): triple TTs - max 12, displacement 1000t ($0.25, 2 of 2 Halfs, start 1913-H1)
Army-Light Infantry Tech
1905 Advanced (+1) 5/1.5 ($0.25, 2 of 2 Halfs, start 1913-H1)




Total Military: $4.58

Industrial Investment: $21 + 6.92

Needs to be repaired

1.0 IC cost ($37.5)
$6.87 = 6.87 + 15.46+11.96 + 3.21 = 37.5 / 37.5

New IC
$0.05 = 0.05 / 75


Build New IC
21 = 21+18+18+18 = 75 / 75

Repaired
Type 1, Dry-Dock
0.5 BP cost ($75)
Port of Athens, Type 1 Harbor damaged 25% needs $3.75 & 1.0 BP

Army Data Sheet


Greek ARMY 1913 January 1

Corps...Name.........Type.....Strength..Morale..Rating..Artillery.Status.Upkeep..Ammo..Location
SPECIALIST LIGHT FORMATIONS
I.....I Mountain....MNT......83......Regular...5.......1.5........a......1.25....0.0...Greece

FORTRESS INFRASTRUCTURE:                       

Nil

MILITIA
II.....II Reserve..INF......75.......None....4.......2.........n......0.0.....0.0...Portugal
III......III Reserve...INF......75.......None....4.......2.........n......0.0.....0.0...Spain




Navy Data Sheet

Name........Disp....LD/Com/R.Status...Location,
TB-1........250.....1912
TB-2........250.....1912
TB-3........250.....1912
TB-4........250.....1912
TB-5........250.....1912
TB-6........250.....1912
TB-7........250.....1912
TB-8........250.....1912
TB-9........250.....1912
TB-10.......250.....1912
TB-11.......250.....1912
Athens......2893....1897 (refit 1909) (ex-Iberian Gorilla)
Sparta......4700....1901 (refit 1912( (ex-Peru Viracocha Inca)
Crete.......7006....1895 (refit 1913) (ex-NUS Garibaldi)
Hulk-1......7006....1895 (Ex NUS Pueyyredon)
Hulk-2......10400...1899 (refit 1912) (ex-Peru Cuzco-Lima)