Rohan H2/1915

Started by Ithekro, December 28, 2008, 09:45:32 PM

Previous topic - Next topic

Ithekro

Rohirrim Naval Construction
and Expenditures of the Riddermark.
1915 Second Half Year Report
July 1 - December 31, 1915

Population: 76.5
BP:  27 (+1 in H1/1916)
IC: 123
Revenue: 197.50 +$27.82 for H2/1915

Normal Growth funds:
+1 BP = $83.00 ($0.00 remaining)
+1 IC = $15.75 ($59.25 remaining)

Rohan's military budget is $126.57


Total Army upkeep: $29.00
Maintenance: 394.4x2.5% = $14.06
------------------------------------------
Spent $43.06 in upkeep.

Thus $83.51 remains.

Department of Hobbits: $1

$82.51 remains


Newly Budgeted Vessels of the Mark:


Belted Cruiser Meneltarma = $8.30
Belted Cruiser Erebor = $8.30
12 x Éomund-class destroyers = $15.00
Tender Tol Uinen = $10.44
Tender Tol Brandir = $10.44
Tender Cair Andros = $10.44



Total = $62.92



Remainder
$ 19.59


Research:

New 15.5"/42 cal Cannon/Twin Mount
H1/1914 + H2/1914 + H1/1915 + H2/1915 = $1 (Finished)
Fire Control:
1912: primitive FC computers -18kyd
(H1/1912 + H2/1912 + H1/1913 + H2/1913 + H1/1914 + H2/1914 + H1/1915 + H2/1915) = $1 (success)
Naval Propulsion:
Geared Drives:
(H2/1913 + H1/1914 + H2/1914 + H1/1915 + H2/1915) = $1
Naval Propulsion:
Electric Drive:
(H2/1913 + H1/1914 + H2/1914 + H1/1915 + H2/1915) = $1 (success)
Naval Propulsion:
Engine Year 1916:
(H1/1915 + H2/1915) = $1
Armor Technology:
Improved Krupp Cemented Armor Type
(H1/1915 + H2/1915) = $1
Motorization:
Motorized HQ
(H1/1915 + H2/1915) = $1
Light Armor:
Armored cars
(H1/1915 + H2/1915) = $1
Anti-aircraft Weapons:
Cutting Edge (+3) 40-80mm artillery/15,000 feet
(H1/1915 + H2/1915) = +1
Line Infantry Technology:
Cutting Edge (+3)
(H1/1915 + H2/1915) = $1
Light Infantry/Cavalry Technology:
Cutting Edge (+3)
(H1/1915 + H2/1915) = $1
Gun Technology:
1920 era guns:
(H2/1915+ $1



Remainder $8.59

Infrustructure:
Naval:

Expanding the Type 2 slipway at Forlond to Type 3 = $4 + 1 BP (none remaining)
Expanding the Type 2 slipway at Harlond to Type 3 = $3 + 1 BP ($1 remaining)




Remainder $0.59
-------------------------------------------------------------------------------

Army Upkeep:

Active Units:
-----------------------------------------
10 Infantry Corp (rating of 5)
Cost: $10 upkeep 1/8: $1.25 each x10 = $12.50
2 Cavalry Corp (rating of 5)
Cost: $8 upkeep 1/8: $1.25 each x2 = $2.5
Elites:
4 Cavalry Corp (rating of 5)
Cost $8 upkeep 1/4: $2.50 each x4 = $10

Reserves:
-----------------------------------------
8 Infantry Corp (rating 5)
Cost: $10 upkeep 1/40: $0.25 each x 8 = $2
4 Cavalry Corp (rating 5)
Cost: $8 upkeep 1/40: $0.25 each x 4 = $1.00

Total Army size: 28

Total upkeep: $29.00


Naval Upkeep:

Active Fleet
---------------------------------------------
Ship or class - year laid down (Standard Displacement in tons)



Battleships:

Narm – laid down in 1909 (24,458)
Aragorn – laid down 1909 (24,458)
Fengel – laid down 1907 (21,522)
Helm Hammerhand – laid down 1907 (21,522)
Walda – laid down 1904 (17,565)
Freawine – laid down 1902 (17,565)
Shadowfax - laid down 1899 (15,589)
Arcadia - laid down 1899 (15,589)
Brytta - laid down 1898 (15,652)
Elfwine - laid down 1897 (15,652)
Eomer - laid down 1895 (15,625)
Theoden - laid down 1893 (13,342)
Goldwine - laid down 1894 (13,342)


= 231,881 tons

Battlecruisers:

Arod – laid down in 1910 (20,849)
Felaróf – laid down in 1909 (20,849)
Firefoot = laid down in 1908 (15,474)
Windfola – laid down in 1907 (15,474)
Snowmane – laid down in 1906 (15,474)

= 88,120 tons

Coastal Battleships:

None


Combat Cruisers:

Valandil – laid down 1906 (13,991)
Calmacil – laid down 1901 (9,324)
Romidacil - laid down 1898 (9,324)
Narmacil - laid down 1897 (9,324)
Ostoher - laid down 1896 (9,202)
Eldacar - laid down 1893 (6,928)

= 58,093 tons

Armored Cruisers:

Brethil (ex-Hill) – laid down 1892 (10,185)
Dorthonion (ex-Sherman) - laid down 1892 (10,185)

= 20,370 tons


Belted Cruisers:

Taras – laid down 1913 (8,294)
Taniquetil – laid down 1912 (8,294)
Cloudyhead – laid down 1908 (9,055)
Redhorn – laid down 1908 (9,055)
Silvertine – laid down 1907 (9,055)
Dwimorberg - laid down 1904 (6,246)
Irensaga - laid down 1904 (6,246)
Starkhorn – laid down 1903 (6,469)
Nevrast (ex-Toothfish) - laid down 1895 (3,108)
Minas Harthad (ex-Bluefin) - laid down 1892 (4,763)
Aros (ex-Snapper) - laid down 1890 (2,198)
Ramdal (ex-Salmon) - laid down 1890 (2,198)

= 74,981 tons

Protected Cruisers:

Minrimmon - laid down 1902 (4,163)
Methedras – laid down 1895 (2,177)
Caradhras - laid down in 1895 (2,177)
Gundabad - laid down 1891 (1,508)
Celebdil - laid down 1891 (1,508)
Yaquina (ex-Laredo) – laid down 1891 (1,977)
Karok (ex-Torreon) – laid down 1891 (1,977)
Kusa (ex-Wilmimgton) – laid down 1891 (1,977)
Coqu (ex-Abilene) – laid down 1891 (1,977)
Kusa (ex-Socorro) – laid down 1891 (1,977)
Umpqua (ex-Tucson) – laid down 1891 (1,977)


= 23,395 tons

Destroyers:

Gárulf – laid down 1913 (1,000)
Gálmód – laid down 1913 (1,000)
Elfhild – laid down 1913 (1,000)
Eohdwyn – laid down 1913 (1,000)
Eledhwyn – laid down 1913 (1,000)
Eogladden – laid down 1913 (1,000)
Éomund – laid down 1912 (1,000)
Forthwini – laid down 1912 (1,000)
Fram – laid down 1912 (1,000)
Frumgar – laid down 1912 (1,000)
Léod – laid down 1912 (1,000)
Marhwini – laid down 1912 (1,000)
Húrin – laid down in 1912 (730)
Golasgil – laid down in 1912 (730)
Duinhir – laid down in 1912 (730)
Dervorin – laid down in 1912 (730)
Duilin – laid down in 1912 (730)
Derufin – laid down in 1912 (730)
Forlong – laid down in 1910 (730)
Hirluin – laid down in 1910 (730)
Fastred – laid down in 1910 (730)
Erkenbrand – laid down in 1910 (730)
Dúnhere – laid down in 1910 (730)
Déorwin – laid down in 1910 (730)
Guthláf – laid down in 1910 (730)
Harding – laid down in 1910 (730)
Herefara – laid down in 1910 (730)
Herubrand – laid down in 1910 (730)
Horn – laid down in 1910 (730)
Grimbold – laid down in 1910 (730)
Challenging Rabbit – laid down 1907 (765)
Falling Elk – laid down 1907 (765)
Balanced Eagle – laid down 1907 (765)
Gentle Dragon – laid down 1907 (765)
Dancing Bear – laid down 1907 (765)
Running Wolf – laid down 1907 (765)
Blue Hand – laid down 1904 (805)
Hallow Field – laid down 1904 (805)
Nia Rampage – laid down 1904 (805)
Gallant Runner – laid down 1904 (805)
War Dawn – laid down 1904 (805)
First Dawn – laid down 1904 (805)
Ramheart – laid down 1904 (805)
Middleton – laid down 1904 (805)
Shearfoot – laid down 1900 (805)


= 36,975 tons

Torpedo Boats:

Radburg – laid down 1902 (154)


= 154 tons

Colliers:

Himling (ex-Generoso) - laid down 1885 (6,115)
Tolfalas - laid down 1885 (2,923)
Tol Morwen - laid down 1888 (2,923)
Tol Fuin - laid down 1889 (2,923)

= 14,884 tons

Tenders:

Tol Eressea – laid down 1913 (10,444)
Balar – laid down 1913 (10,444)
Almaren – laid down 1913 (10,444)

= 31,332 tons

Privateers:

Queen Emeraldas – laid down 1897 (7,982)
Star of Earendil – laid down 1895 (6,640)

= 21,262 tons

Coastal Batteries:

= 2,800 tons




Total Active Fleet 562,450 tons
Maintenance: 562.450 x 2.5% = $14.06


Navy Construction:
-------------------------------------------------------------------------------------------------
Newly Budgeted Vessels of the Mark:


Belted Cruiser Meneltarma = $8.30
Belted Cruiser Erebor = $8.30
12 x Éomund-class destroyers = $15.00
Tender Tol Uinen = $10.44
Tender Tol Brandir = $10.44
Tender Cair Andros = $10.44



Total = $62.92


Under Construction:
------------------------------------------------------------------------------------------------
Rohan:

at Forlond

S2 idle
S2-S3 Expanding
D2 idle
D3 idle

at Harlond

S2-S3 Expanding
S1 Construction begins on Destroyer Feolcwine (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D3 idle
D1 Construction brgins on Destroyer Haleth (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete

at South Mithlond

S3 Idle
S3 Construction begins on the Battleship Peregrin (1,000 tons delivered) 34,627 tons needed, will require 1,309 days to complete (finishes during H2/1918) – 30,223 tons needed to complete.
S3 Construction continuess on Battleship Eorl (1,000 tons delivered) 34,627 tons needed, will require 1,309 days to complete (finishes during H1/1918) – 30,069 tons needed to complete.
S1 idle
D3 idle

at North Mithlond

S2 Construction begins on the tender Tol Uinen (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (Finishes during H2/1916) – 2,000 tons needed to complete.
D2 Construction begins on the tender Tol Brandir (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (Finishes during H2/1916) – 2,000 tons needed to complete.
D2 Construction begins on the tender Cair Andros (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (Finishes during H2/1916) – 2,000 tons needed to complete.
D1 Construction begins on Destroyer Olwyn (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D1 Construction begins on Destroyer Leofa (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete

at Dol Amroth

S2 Construction begins on the Belted Cruiser Meneltarma (1,000 tons delivered) 8,294 tons needed, will require 519 days to complete (will finish during H2/1916) – 7,294 tons needed to complete.
S2 Construction begins on Belted Cruiser Erebor (1,000 tons delivered) 8,294 tons needed, will require 519 days to complete (will finish during H2/1916) – 7,294 tons needed to complete.
D2 idle
D2 idle

at Pelargir

S1 Construction begins on Destroyer Gamwym (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
S1 Construction begins on Destroyer Bereth (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D2 Construction begins on Destroyer Theodwyn (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D1 Construction begins on Destroyer Lothiriel (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete

at Umbar

D1 Construction begins on Destroyer Arodred (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D1 Construction begins on Destroyer Wídfara (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D1 Construction begins on Destroyer Merithain (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete
D1 Construction begins on Destroyer Waldmond (365 tons delivered) 730 tons needed, will require 292 days to complete (finishes during H1/1916) – 365 tons needed to complete


New Beleriand:

at Vinyamar (Corinto)

S2 idle
S1 idle
D2 idle
D1 idle

at Eglarest (Bluefields)

S2 idle
S2 Construction begins on Belted Cruiser Gundabad (1,000 tons delivered) 8,294 tons needed, will require 519 days to complete (finishes during H1/1916) – 6,000 tons needed to complete.
D2 Construction begins on Belted Cruiser Methedras (1,000 tons delivered) 8,294 tons needed, will require 519 days to complete (finishes during H1/1916) – 6,000 tons needed to complete.
D2 idle

at Brithombar (Puerto Cabezas)

S3 Construction continues on the Battleship Aldor (1,655 tons delivered) 27,759 tons needed (+1,000 for Fire Control refit on stocks – done H2/1911), will require 1,103 days to complete (finishes during H1/1914) – 13,679 tons needed to complete
S1 idle
D3 Construction continues on the Battleship Samwise (1.655 tons delivered) 27,759 tons needed, will require 1,103 days to complete (finishes during H2/1914) – 13,679 tons needed to complete
D1 idle

at Ammon-In-Gelydh (San Jaun del Sur)

S3 Construction continues on Battlecruiser Hasufel (5,000 tons delivered) 20,919 tons needed, will require 895 days to complete (finishes during H2/1913) – 4,112 tons needed to complete.
S1 idle
D3 Construction continues on Battleship Uplond (1,655 tons delivered) 28,897 tons needed, will require 1,137 days to complete (finishes during H2/1916) – 22,792 tons needed to complete
D3 Construction continues on Battleship Berold (1,655 tons delivered) 28,897 tons needed, will require 1,137 days to complete (finishes during H1/1916) – 22,792 tons needed to complete
D1 idle

South America:

at Puerto Montt

D1 idle


25,000 tons of material used.

Notes:



Ships of the Fleet: December 31, 1915 of the Sixth Age

Ship type - number in service (repair/refit/reserve) under construction (undergoing work for foreign power)

Battleships: 13 (0) 6
Battle Cruisers: 5 (0) 1
Combat Cruisers: 6 (0) 0
Armored Cruisers: 2 (0) 0
Belted Cruisers: 12 (0) 4
Protected Cruisers: 11 (0) 0
Destroyers: 45 (0) 12
Torpedo Boats: 1 (0) 0
Colliers: 4 (0) 0
Tenders: 3 (0) 3
Privateers: 2 (0) 0


The Rock Doctor

Good to see you back.

Destroyers are such ugly things - wouldn't Rohan prefer to build tramp freighters?

Ithekro

#2
Working on those as well (three more tenders).  Of course two more battleships in 1916 is a must...probably the first 15.5" jobs.

I must remind myself to spend on the army and air corp.

The Rock Doctor

There you go - I have tenders on my mind again as well.