Iberia 1914 H1

Started by miketr, November 20, 2008, 07:54:24 AM

Previous topic - Next topic

miketr

Empire of Iberia and Common Wealth, January in the Year of our Lord 1914


Pop       BP         IC         Rev       
Spain21.6462445.64
Portugal6.492.5915.49
Canarias0.54000.51.008
Puerto Rico1.080.2512.016
Brazil 21.64 3.52040.328
Philippines7.911.75714.182
Total59.301454.5118.664


War Budget: NO

Other Income: $2 Per half from Russia for Gibraltar Lease plus 3,000 tons of hull steel from Bavaria plus $10 roleplay one time bonus
Roll over BP: 0.0 (2nd half only from first halves)

Total Budget:  $130.664 & 17 BP

Army Maintenance: $17.45
Army Construction: $4 / 0.5 BP

Navy Maintenance: $4.35
Navy Construction: $39.4 / BP 16.5 
Special Ops: $1
--Project ID spent this half (already spent / needed to finish)
--AC-1912-A $2.2 / 2.3 BP ($10.3 / 23.5 & BP 10.3 / 23.5)
--AC-1912-B $3 / 3 BP ($9 / 23.5 & BP 9 / 23.5)
--BB-1912-A $3 / 3 BP ($9.15 / 23 & BP 9.15 / 23)
--BB-1912-B (Being built in Russia) Weapons $3.3 /3.3 BP ($0 / 3.3 & BP 0 / 3.3)
--PC-1913-3.5K-C $0.5 / 0.5 BP ($3 / 3.5 & BP 3 / 3.5)
--PC-1913-3.5K-D $0.5 / 0.5 BP ($3 / 3.5 & BP 3 / 3.5)
--PC-1913-3.5K-E $2 / 2 BP ($0 / 3.5 & BP 0 / 3.5)
--PC-1913-3.5K-F $2 / 2 BP ($0 / 3.5 & BP 0 / 3.5)

--Repairs + Refit
Repair of army damage from Balkan Wars, $4 and 0.5 BP

--To Gran Columbia $4.8 (2.4 civilian & 2.4 military) IC investments
--To Austria $2.4 (1.2 civilian & 1.2 military) IC investments
--To Russia $8 ($17/43.75)+5.75 cost of foreign construction
--To Republic of Orange $10 ($5/19) +2 cost of foreign construction
--To Greece $1 aid

Part 1 of 3

miketr

Research: $5
--Heavier-than-air crafts
----1910: hostirical 1914 aircrafts (start 1914 H1, half year 1) ($1)
--Destroyer and TB architecture
----1912: max displacement 1500t (start 1912 H1, half year 5) ($1)
--Rangefinding, Fire Control and Gunnery (development takes twice as long as a normal tech)
----1908: centralized FC, early directors - 12kyd (start 1913 H1 w/ foreign aid $.25, half year 3 of 4) (From NUS)
--Submarines
----1910 (start 1913 H2 w/ foreign aid $.25, half year 2 of 2) (From OR)
--New Naval Gun 350mm/13.78"L45 (Start 1913 H2 $.5 Half year 2 of 4)
--New Naval Mount Twin 350mm/13.78"L45 (Start 1914 H1 $.5 Half year 1 of 2)
--New Naval Gun 150mm (cutting edge based on baseline 150mm) (Start 1913 H2 $.25 Half year 2 of 4)
--New Naval Mount 150mm Advanced Twin (Start 1913 H2 $.25 Half year 2 of 2)
--New Naval Gun 120mm (cutting edge based on baseline 120mm) (Start 1913 H2 $.25 Half year 2 of 4)
--New Naval Mount 120mm Advanced Twin (Start 1914 H1 $.25 Half year 1 of 2)
--New Naval Gun 75mm (cutting edge based on baseline 75mm) (Start 1913 H2 $.25 Half year 2 of 4)
--New Naval Gun 50mm (cutting edge based on baseline 50mm) (Start 1914 H1 $.25 Half year 1 of 4)

--New Naval Gun 13"L45 (start 1913 H1 $.0, half year 1 of 4) (SUSPENDED!)

FINISHED
--New Naval Gun 305mm/12"L50 (start 1913 H1 w/ foreign aid $.5, half year 2 out of 2) (From Italy)
--CBR warfare:
----1910 Cutting Edge (+3): Phosgene (start 1913 H1 w/ foreign aid $.25, half year 2) (From GC)
--And some other miscellaneous propulsion technology:
----1906 Electric Propulsion (start 1913 H1 w/ foreign aid $.25, half year 2) (From NUS)
--Night fighting
----1908: basic tactics, searchlight, night scopes (start H1/1911, half year 6) ($1)

--Army Mobilization and Reserves:
----1910 Cutting Edge (+3): Can maintain three reserve units per one active strength unit OR at General Mobilization can begin moving units from depots on day 5(start 1912 H2, half year 2)
--Internal Combustion Engines (Land, submarines, and air)
----1905 Cutting Edge(+3):Diesel engines, Land, airship and naval engines up to 750HP, 75 HP aeroplane engines (start 1912 H2 w/ foreign aid $.25, half year 2) (From GC)
--Radar technology (double-time tech)
----1905: Advanced (+1): Early Huelsmeyer-type "radar", listening dishes, War tuba's. (start 1911 H1 w/ foreign aid $.25, half year 4) (From GC)
--Gun Technology
----1907 Cutting Edge(+3) (start 1912 H1 w/ foreign aid $.25, half year 2) (From GC)
--Torpedo Technologies
----1908 Cutting Edge (+3): 7000@26, 3000@35, 100kg warhead, imp. wet heater, 1t, 21"(start 1912 H1 w/ foreign aid $.25, half year 2) (From GC)
--Mine Warfare
----1908: Advanced (+1): advanced paravanes, active charges. Reliable horn mines, early antenna mines. (start 1912 H1 w/ foreign aid $.25, half year 2) (From GC)
--Amphibious Technology
----1910 Cutting edge (+3) LST ships (start 1912 H1 w/ foreign aid $.25, half year 2) (From GC)
--Anti-aircraft gun and altitudes
----1908 Advanced (+1): High angle anti-air guns (20-40mm) = 5,000 feet (start 1912 H1 w/ foreign aid $.25, half year 2) (From GC)
--New Naval Gun 13" / 330mm L40 (based upon 12" / 305mm L40) (start H1/1910, half year 4) ($0.5)
--New Twin 13" turret (start H2/1910, half year 2) ($0.5)



Civilian Items
Industrial Investment: $59.464
--57.776 Towards repair of 0.5 BP in Greece (17.224 + 57.776 = 75 / 75
--1.688 Towards building of 0.5 BP in Brazil (1.688 = 1.688 / 150)

Part 2 of 3