Rohan H2/1914

Started by Ithekro, November 11, 2008, 02:46:48 PM

Previous topic - Next topic

Ithekro

Rohirrim Naval Construction
and Expenditures of the Riddermark.
1914 Second Half Year Report
July 1 - December 31, 1914

Population: 76.5
BP:  27
IC: 123
Revenue: 197.50 +$32.39 for H2/1914

Normal Growth funds:
+1 BP = $99.75 ($181.75 remaining)

Rohan's military budget is $132.14


Total Army upkeep: $29.00
Maintenance: 394.4x2.5% = $11.12
------------------------------------------
Spent $40.12 in upkeep.

Thus $92.02 remains.

Department of Hobbits: $1

$91.02 remains


Newly Budgeted Vessels of the Mark:


Battleship Eorl = $34.63
Battleship Peregrin = $34.63


Total = $69.26



Remainder
$ 22.76


Research:

Fire Control:
New 15.5"/42 cal Cannon/Twin Mount
(H1/1914 + H2/1914) = $1
1912: primitive FC computers -18kyd
(H1/1912+H2/1912+H1/1913+H2/1913+H1/1914+H2/1914) = $1
Naval Propulsion:
Geared Drives:
(H2/1913+H1/1914+H2/1914) = $1
Naval Propulsion:
Electric Drive:
(H2/1913+H1/1914+H21914) = $1



Remainder $18.76

Infrustructure:
Naval:
Expansion of the Type 2 Slipway at South Mithlond to Type 3 = $4 + 1 BP ($0 remaining)
Expansion of the Type 2 Slipway at South Mithlond to Type 3 = $4 + 1 BP ($0 remaining)
Expansion of the Type 2 Drydock at Harlond to Type 3 = $5 + 1 BP ($0 remaining)
Expansion of the Type 2 Drydock at Forlond to Type 3 = $5 + 1 BP ($0 remaining)




Remainder $0.76
-------------------------------------------------------------------------------

Army Upkeep:

Active Units:
-----------------------------------------
10 Infantry Corp (rating of 5)
Cost: $10 upkeep 1/8: $1.25 each x10 = $12.50
2 Cavalry Corp (rating of 5)
Cost: $8 upkeep 1/8: $1.25 each x2 = $2.5
Elites:
4 Cavalry Corp (rating of 5)
Cost $8 upkeep 1/4: $2.50 each x4 = $10

Reserves:
-----------------------------------------
8 Infantry Corp (rating 5)
Cost: $10 upkeep 1/40: $0.25 each x 8 = $2
4 Cavalry Corp (rating 5)
Cost: $8 upkeep 1/40: $0.25 each x 4 = $1.00

Total Army size: 28

Total upkeep: $29.00


Naval Upkeep:

Active Fleet
---------------------------------------------
Ship or class - year laid down (Standard Displacement in tons)



Battleships:

Fengel – laid down 1907 (21,522)
Helm Hammerhand – laid down 1907 (21,522)
Walda – laid down 1904 (17,565)
Freawine – laid down 1902 (17,565)
Shadowfax - laid down 1899 (15,589)
Arcadia - laid down 1899 (15,589)
Brytta - laid down 1898 (15,652)
Elfwine - laid down 1897 (15,652)
Eomer - laid down 1895 (15,625)
Theoden - laid down 1893 (13,342)
Goldwine - laid down 1894 (13,342)


= 182,965 tons

Battlecruisers:

Felaróf – laid down in 1909 (20,849)
Firefoot = laid down in 1908 (15,474)
Windfola – laid down in 1907 (15,474)
Snowmane – laid down in 1906 (15,474)

= 67,271 tons

Coastal Battleships:

None


Combat Cruisers:

Valandil – laid down 1906 (13,991)
Calmacil – laid down 1901 (9,324)
Romidacil - laid down 1898 (9,324)
Narmacil - laid down 1897 (9,324)
Ostoher - laid down 1896 (9,202)
Eldacar - laid down 1893 (6,928)

= 58,093 tons

Armored Cruisers:

Brethil (ex-Hill) – laid down 1892 (10,185)
Dorthonion (ex-Sherman) - laid down 1892 (10,185)

= 20,370 tons


Belted Cruisers:

Cloudyhead – laid down 1908 (9,055)
Redhorn – laid down 1908 (9,055)
Silvertine – laid down 1907 (9,055)
Dwimorberg - laid down 1904 (6,246)
Irensaga - laid down 1904 (6,246)
Starkhorn – laid down 1903 (6,469)
Nevrast (ex-Toothfish) - laid down 1895 (3,108)
Minas Harthad (ex-Bluefin) - laid down 1892 (4,763)
Aros (ex-Snapper) - laid down 1890 (2,198)
Ramdal (ex-Salmon) - laid down 1890 (2,198)

= 58,393 tons

Protected Cruisers:

Minrimmon - laid down 1902 (4,163)
Methedras – laid down 1895 (2,177)
Caradhras - laid down in 1895 (2,177)
Gundabad - laid down 1891 (1,508)
Celebdil - laid down 1891 (1,508)
Yaquina (ex-Laredo) – laid down 1891 (1,977)
Karok (ex-Torreon) – laid down 1891 (1,977)
Kusa (ex-Wilmimgton) – laid down 1891 (1,977)
Coqu (ex-Abilene) – laid down 1891 (1,977)
Kusa (ex-Socorro) – laid down 1891 (1,977)
Umpqua (ex-Tucson) – laid down 1891 (1,977)


= 23,395 tons

Destroyers:

Gárulf – laid down 1913 (1,000)
Gálmód – laid down 1913 (1,000)
Elfhild – laid down 1913 (1,000)
Eohdwyn – laid down 1913 (1,000)
Eledhwyn – laid down 1913 (1,000)
Eogladden – laid down 1913 (1,000)
Éomund – laid down 1912 (1,000)
Forthwini – laid down 1912 (1,000)
Fram – laid down 1912 (1,000)
Frumgar – laid down 1912 (1,000)
Léod – laid down 1912 (1,000)
Marhwini – laid down 1912 (1,000)
Húrin – laid down in 1912 (730)
Golasgil – laid down in 1912 (730)
Duinhir – laid down in 1912 (730)
Dervorin – laid down in 1912 (730)
Duilin – laid down in 1912 (730)
Derufin – laid down in 1912 (730)
Forlong – laid down in 1910 (730)
Hirluin – laid down in 1910 (730)
Fastred – laid down in 1910 (730)
Erkenbrand – laid down in 1910 (730)
Dúnhere – laid down in 1910 (730)
Déorwin – laid down in 1910 (730)
Guthláf – laid down in 1910 (730)
Harding – laid down in 1910 (730)
Herefara – laid down in 1910 (730)
Herubrand – laid down in 1910 (730)
Horn – laid down in 1910 (730)
Grimbold – laid down in 1910 (730)
Challenging Rabbit – laid down 1907 (765)
Falling Elk – laid down 1907 (765)
Balanced Eagle – laid down 1907 (765)
Gentle Dragon – laid down 1907 (765)
Dancing Bear – laid down 1907 (765)
Running Wolf – laid down 1907 (765)
Blue Hand – laid down 1904 (805)
Hallow Field – laid down 1904 (805)
Nia Rampage – laid down 1904 (805)
Gallant Runner – laid down 1904 (805)
War Dawn – laid down 1904 (805)
First Dawn – laid down 1904 (805)
Ramheart – laid down 1904 (805)
Middleton – laid down 1904 (805)
Shearfoot – laid down 1900 (805)


= 36,975 tons

Torpedo Boats:

Radburg – laid down 1902 (154)


= 154 tons

Colliers:

Himling (ex-Generoso) - laid down 1885 (6,115)
Tolfalas - laid down 1885 (2,923)
Tol Morwen - laid down 1888 (2,923)
Tol Fuin - laid down 1889 (2,923)

= 14,884 tons

Privateers:

Queen Emeraldas – laid down 1897 (7,982)
Star of Earendil – laid down 1895 (6,640)

= 21,262 tons

Coastal Batteries:

= 2,800 tons




Total Active Fleet 444,765 tons
Maintenance: 444.765 x 2.5% = $11.12


Navy Construction:
-------------------------------------------------------------------------------------------------
Newly Budgeted Vessels of the Mark:


Battleship Eorl = $34.63
Battleship Peregrin = $34.63


Total = $69.26


Under Construction:
------------------------------------------------------------------------------------------------
Rohan:

at Forlond

S2 idle
S2 idle
D2 Overhaul of Combat Cruiser Narmacil (completed H2/1914)
D2-D3 Expanding

at Harlond

S2 idle
S1 idle
D2-D3 Expanding
D1 idle

at South Mithlond

S2-S3 Expanding
S2-S3 Expanding
S3 Construction begins on Battleship Eorl (154 tons delivered) 34,627 tons needed, will require 1,309 days to complete (finishes during H1/1918) – 34,473 tons needed to complete.
S1 idle
D3 Construction continues on Battlecruiser Arod (3,000 tons delivered) 20,919 tons needed (+1,000 for Fire Control refit on stocks – done H2/1911), will require 895 days to complete (finishes during H2/1912) – 3,810 tons needed to complete.

at North Mithlond

S2 idle
D2 Overhaul of Combat Cruiser Ostoher (completed H2/1914)
D2 Overhaul of Training Cruiser Eldacar (completed H2.1914)
D1 idle
D1 idle

at Dol Amroth

S2 Construction continues on Battleship Aragorn (5,901 tons delivered) 24,548 tons needed (+1,000 for Fire Control refit on stocks – done H2/1911), will require 1,033 days to complete (finishes during H2/1911) – 0 tons needed to complete (Completed)
S2 Construction continues on Battleship Narm (4,000 tons delivered) 24,548 tons needed (+1,000 for Fire Control refit on stocks – done H2/1911), will require 1,033 days to complete (finishes during H1/1912) – 0 tons needed to complete (Completed)
D2 Construction begins on the tender Balar (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (finishes during H2/1914) – 0 tons needed to complete (Completed)
D2 Construction begins on the tender Almaren (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (finishes during H2/1914) – 0 tons needed to complete (Completed)

at Pelargir

S1 idle
S1 idle
D2 Construction begins on the tender Tol Eressea (1,000 tons delivered) 3,000 tons needed (10,444 ton vessel) will require 360 days to complete (Finishes during H1/1914) – 0 tons needed to complete. (Completed)
D1 idle

at Umbar

D1 idle
D1 idle
D1 idle
D1 idle


New Beleriand:

at Vinyamar (Corinto)

S2 Contruction continues on Belted Cruiser Taniquetil (2,044 tons delivered) 8,294 tons needed, will require 519 days to complete (finishes during H2/1913) – 0 tons needed to complete. (Completed)
S1 idle
D2 idle
D1 idle

at Eglarest (Bluefields)

S2 Construction begins on Belted Cruiser Taras (500 tons delivered) 8,294 tons needed, will require 519 days to complete (finishes during H2/1914) – 3,794 tons needed to complete.
S2 idle
D2 Overhaul of Combat Cruiser Romendacil (completed H2/1914)
D2 idle

at Brithombar (Puerto Cabezas)

S3 Construction continues on the Battleship Aldor (500 tons delivered) 27,759 tons needed (+1,000 for Fire Control refit on stocks – done H2/1911), will require 1,103 days to complete (finishes during H1/1914) – 17,334 tons needed to complete
S1 idle
D3 Construction continues on the Battleship Samwise (500 tons delivered) 27,759 tons needed, will require 1,103 days to complete (finishes during H2/1914) – 17,334 tons needed to complete
D1 idle

at Ammon-In-Gelydh (San Jaun del Sur)

S3 Construction continues on Battlecruiser Hasufel (500 tons delivered) 20,919 tons needed, will require 895 days to complete (finishes during H2/1913) – 12,112 tons needed to complete.
S1 idle
D3 Construction begins on Battleship Uplond (500 tons delivered) 28,897 tons needed, will require 1,137 days to complete (finishes during H2/1916) – 25,447 tons needed to complete
D3 Construction begins on Battleship Berold (500 tons delivered) 28,897 tons needed, will require 1,137 days to complete (finishes during H1/1916) – 26,447 tons needed to complete
D1 idle

South America:

at Puerto Montt

D1 idle


23,000 tons of material used.

Notes:



Ships of the Fleet: December 31, 1914 of the Sixth Age

Ship type - number in service (repair/refit/reserve) under construction (undergoing work for foreign power)

Battleships: 13 (0) 5
Battle Cruisers: 4 (0) 2
Combat Cruisers: 6 (0) 0
Armored Cruisers: 2 (0) 0
Belted Cruisers: 11 (0) 1
Protected Cruisers: 11 (0) 0
Destroyers: 45 (0) 0
Torpedo Boats: 1 (0) 0
Colliers: 4 (0) 0
Tenders: 3 (0) 0
Privateers: 2 (0) 0