Project RR

Started by Logi, August 25, 2008, 11:45:27 AM

Previous topic - Next topic

Logi

Project RR - Railroad Industralization



The Republic of Ireland has decided to start connecting mines to major cities, in an effort to quicken industralization.



The Black lines indicate the planned locations of the new railroad tracks. Overall, the length of the tracks is 2350 kilometers, 150 kilometers of extra tracks is added in to show curves. A total 2500 km of tracks will be laid with this plan.

The plan is expected to be finished in 7-(6.25) years at the fastest, 12.5 years at half speed

Ireland will start the Project on 1913 H2, 0.5 BP and $1 will be paid to lay down 100km of narrow gauge railway track. The tracks will start at Dublin, reach Belfast and eventually circle all the mines, ending at the lone mine at the very tip of Ireland.

Logi

As of January 1, 1917

800 km of track has been laid down and things are starting to pick up. In the last half year alone, 300 km of track was laid down. It is expected Ireland will soon have the ability to lay down 800 km of track a year.

Logi

As of January 1, 1920

1400km of track has been laid down. 1100km of track left to go.