Gran Colombia, H1/1908

Started by The Rock Doctor, July 12, 2007, 06:57:57 PM

Previous topic - Next topic

The Rock Doctor

GRAN COLOMBIA:  FIRST HALF REPORT, 1908


Area:   Population:   BP:         IC:           Revenue
Heartland   35.40 million12.90190.5125.9
Caribbean 8.16 million 31826.16
Amazonas del Sur  1.00 million0.50034
Total44.56 million16.410111.5156.06

Note:  Cook Islands aren't generating revenue.  Coquimbo's revenue will go directly towards integrating itself into the Gran Colombian economy, so I won't tally it until H2.

Additional Income/Expenditures:
    -$7.77 (Military) to France to purchase two obsolete battleships for scrapping
    -$0.46 (Military) and 0.321 BP generated from last year's scrapping of Foresight class TBs
    -$10 (Civ) to DKB for the lovely Cook Islands
    -$4 (Mil) to DKB for Submarine (Advanced) Technology
    -$2 (Mil) to Hapsburgers for Infantry Equipment (Advanced) Technology

Status:  Peace time, with limited mobilization. 

Total Budget (maximum military budget):  $64.72 military and $68.03 civilian, plus 16.731 BP as required.

A.  NAVAL OPERATIONS:  $21.21, 16.703 BP

Armada Maintenance Requirements:  $6.04

Armada Construction Requirements:
    -PC-22, Chiriqui Grande, underway at La Guaira: $0, 0.369 BP, completed end of April
    -PC-23, Monagrillo, underway at Cromwell: $0, 0.369 BP, completed end of April
    -PC-24, Tonosi, underway at Colon: $0, 0.369 BP, completed end of April
    -PC-25, Guarumal, underway at Cartagena: $0, 0.369 BP, completed end of April
    -PC-26, Horconcitos, underway at Esmeraldas: $0, 0.488 BP, completed end of June
    -CP-19, Westmoreland, underway at Cromwell: $0, 1.788 BP
    -CP-20, Trelawny, underway at Montego Bay: $0, 1.788 BP
    -CP-21, Roraima, underway at La Guaira: $0, 1.788 BP
    -CP-22, Cayman, underway at Colon: $0, 1.788 BP
    -TB-70, Jatibonico, laid down at Cartagena 1/1/08:  $0.93, 0.4325 BP
    -TB-71, Jiguani, laid down at Cuidad Jorge 1/1/08:  $0.93, 0.4325 BP
    -TB-72, Jaguey Grande, laid down at Cartagena 1/2/08:  $0.93, 0.3605 BP
    -TB-73, Jovellanos, laid down at San Miguelito 1/2/08:  $0.93, 0.3605 BP
    -TB-74, Juangriego, laid down at Colon 1/3/08:  $0.93, 0.2885 BP
    -TB-75, Johi, laid down at Montego Bay 1/3/08:  $0.93, 0.2885 BP
    -MS-01, Orinoco, laid down at La Guaira 1/1/08:  $0.23, 0.354 BP, completed end of June
    -PC-27, Chaguanas, laid down at Cromwell 1/1/08:  $0.57, 0.488 BP
    -PC-28, Arima, laid down at Montego Bay 1/1/08:  $0.57, 0.488 BP
    -PB-01 to PB-14 built at various locations:  Total $0.42, 0.518 BP
    -CP-23, Galapagos, laid down at Cartagena 1/1/08:  $3.92, 1.788 BP
    -CP-24, Trinidad, laid down at Esmeraldas 1/1/08:  $3.92, 1.788 BP

Armada Deletions:
    -BB Formidable scrapped at Cromwell
    -BB Jaureguiberry scrapped at Montego Bay
    -CP Darien transferred to DKB, 1/1/08

Intelligencio del Armada:  $2

B.  LAND OPERATIONS:  $21.4, 0 BP

Ejercito Maintenance Requirements:  $19.4

Ejercito Recruitment and Operations Requirements:
    -None

Intelligencio del Ejercito:  $2

C.  AERONAUTICAL INFRASTRUCTURE:  $0.03, 0.0 BP

Maintenance:  $0.03

Construction and Repair:
    -None

D.  MILITARY INFRASTRUCTURE:  $0, 0 BP

Military Infrastructure Construction and Repair:
    -None, though surveyors begin poking around the Cook Islands

E.  RESEARCH AND DEVELOPMENT:  $6.75

Maximum Projects:  $8

Projects:

    -Propulsion (Oil-firing Boilers):  5th half-year, $1:  Successful.
    -Heavier-Than-Air Craft (Advanced):  5th half-year, $1
    -Dirigible Airships (Advanced):  5th half-year, $1:  Successful.
    -Internal Combustion Engines (Advanced):  5th half-year, $1
    -Infantry Equipment (Advanced):  1st half-year digesting acquired technology, $0.25
    -BB/AC Architecture (Cutting Edge):  1st half-year digesting acquired technology, $0.25*
    -Submarines (Advanced):  1st half-year digesting acquired technology, $0.25
    -Anti-aircraft Guns (Advanced):  1st half-year, $1
    -305mm/50:  1st half-year, $0.5
    -234mm/50:  1st half-year, $0.5

*Acquired from the ex-Iberian, ex-French engineer GC sneaked out of Rio de Janiero last year.

F.  BLACK OPERATIONS:  $1.9

Classified.

G.  CIVILIAN INFRASTRUCTURE, ECONOMIC DEVELOPMENT & OTHER STUFF:  $66.1

Infrastructure Development:
    -None

Economic Development:
    -Heavy Industrial Expansion in the Heartland:  $29.7 adds 0.099 BP, for 13 BP there.  Done.
    -Heavy Industrial Expansion in the Heartland:  $37.5 to finish an IC in the Heartland:  Done.

Carry-Over:
    -$12.19 Military


*END REPORT*



Addendum:  Armada Order of Battle, 30/6/08:

A/B + C  = (In Service or Working Up) / (In Reserve/Training) + Under Construction/Repair/Refit

Battleships, BB:  6/1 + 0
Armored Cruiser, CA:  8/1 + 0
Protected Cruiser, CP:  16/0 + 6
Torpedo Boats, TB:  48/0 + 6
Submarines:  6/0 + 0

Minesweepers, MS:  1/0 + 0
Patrol Cutter, PC:  26/0 + 2
River Gunboats, GR:  4/0 + 0
Patrol Boat, PB:  14/0 + 0

Colliers, AC:  3/0 + 0
Tenders, AT:  5/0 + 0

Coastal Fortresses:  5/0 + 0


Edit:  Revised a gun research program from 240 mm to 234 mm. 

swamphen

Don't forget to add Dairen to Armada Deletions.

(And the transfer might need to be done at Valpariso, not Easter Island, depending on how things develop.)

The Rock Doctor

Edits:

Darien's transfer noted.

Audaz class battleships' scrapping is postponed to 1909: they'll spend 1908 in mothballs.