Middle Kingdom H2/1907

Started by Phoenix, May 18, 2007, 07:27:28 AM

Previous topic - Next topic

Phoenix

Middle Kingdom 2/1907 Report

Pop    BP     IC    GNP   Rev
436   14.8   112   658   288.00

Carry-over: 52$ CIV

Transfers:
1$ MIL and 1$ CIV from DKB for treaty port

Military budget is 145$

Yellow Army
16 Active Baseline Specialist Corps - 16$
(Colonial Infantry - i.e. lots of bayonets/sabres, light on artillery
pieces)

Brown Army
10 Wartime Baseline Infantry/Cavalry Corps - 20$

Red Army -
26 Dated Reserve Colonial Infantry Corps - 3,9$

Fortesses:
2 Large (a 3 corps) and 14 Small
20 Active Baseline Corps - 20$

Total
59,9$ for Army

Train Artillery
240,000 tons of railguns
Wartime upkeep - 9,6$

Navy
267,800 tons fleet
Wartime upkeep - 10,7$

Airforce
6xType 2 Dirigible - 0,3$ upkeep

Upkeep of Great Wall - 20$

Total
100,5$ Military expenses

44,5$ left

Spent on Research:
Infantry Unit's Maximum Equipment Quality from baseline (0) to advanced (+1)
cost = 1 $ (4th time)
Artillery Shells from baseline (0) to advanced (+1)
cost = 1 $ (4th time)
Mine Warfare from baseline (0) to advanced (+1)
cost = 1 $ (4th time)
IC engines from advanced (+1) to cutting edge (+3)
cost = 1 $ (4th time)
BB/AC Architecture from baseline (0) to advanced (+1)
cost = 1 $ (4th time)
Destroyer and TB architecture from baseline (0) to advanced (+1)
cost = 1 $ (4th time)
Propulsion from advanced (+1) to cutting edge (+3)
cost = 1 $ (4th time)

37,5 $ left

Spent on Naval Construction:
20 Kuaizi Torpedo Boats at 390 tonnes at 10$ and 0,78 BP (estimated 6 months to build)
LAST QUARTER I ACCIDENTLY MIXED UP THE DATA ON THE YONGZI AND XINGZI, FIXED NOW
QH Yongzi (Brave) Cruiser at 7.184 tonnes at 1,73$ and 2,39 BP (estimated 10 months to build, 1,73$ and 2,39 BP already paid, total should be 2,08$ and 7,18BP)
QH Xingzi (Star) Battleship at 11.433 tonnes at 3,28$ and 2,85 BP (estimated 14 months to build, 3,28$ and 2,85BP already paid, total should be 5,25$ and 11,4BP)
QH Mingxing (Bright Star), a Xingzi Class Battleship 3,28$ and 2,85 BP (estimated 20 months to build, total should be 5,25$ and 11,4BP)
total spent is 18,29$ and 8,87BP

Spent on Airforce Construction:
4 dirigible hangars type 2 at the cost of 16$
4 dirigibles type 2 at the cost of 1,6$
Spent: 17.6$

left: 1,61$ MIL and 4,93BP

---------------------------
Civilian budget is 145$ + 52$ carried over

Spent on Infrastructure:
197,2 kilometers of railroad (Standard) from Changsho to Kunming at the cost of 4,93 BP and 9,86$
left: 187,14$ CIV and 0 BP

1,61$ MIL and 187,14$ CIV allocated for new BP, total is 188,75$ of 300$ needed


"Those who dance are often thought mad by those who cannot hear the music."
-- Tao Te Ching