Rohan H2/1907

Started by Ithekro, May 11, 2007, 09:35:55 PM

Previous topic - Next topic

Ithekro

Rohirrim Naval Construction
and Expenditures of the Riddermark.
1907 Second Half Report
July 1 - December 31, 1907

Population: 72 (+1 h1/1908)
BP:  17
IC: 112 (+1 h1/1908)
Revenue: 184.00 +0.35 from h1/1907
(1 Shares to CSA - New Beleriand Canal - $12.50/$10 from the New Swiss - $2.50 from CSA for military spending (new destroyers) and $11 from the New Swiss for military spending = $ 220.35

Normal Growth funds:
+1 IC = $20.00 ($0.00 remaining) Finished
+1 IC = $30.00 ($45.00 remaining)
New Beleriand Canal = $60.50 ($52.50 remaining)
San Francisco relief effort = $5.00


Rohan's military budget is $105.85


Total Army upkeep: $22.80
Maintenance: 425x2.5% = $10.68
------------------------------------------
Spent $33.51 in upkeep.

Thus $72.36 remains.

Newly Budgeted Vessels of the Mark:

Windfola = $17.36
Swiss Constellation = $8.20
Silvertine = $7.98
5 x CSA Destroyers = $5

Remainder
$ 33.83

Army Upgrade:

16 Corps raising from Baseline to Advanced (Rating 5):
5th Corps, 6th Corps, 7th Corps, 9th Corps, 10th Corps, 11th Corps, 12th Corps, 13th Corps, 14th Corps, 1st Gondorian Corps, 3rd Gondorian Corps, 4th Gondorian Corps, 5th Gondorian Corps, 6th Gondorian Corps, 7th Gondorian Corps, 8th Gondorian Corps. = $20.00 + 2.25 BP paid H2/1907 ($12 + 1.75BP remaining) – Active/Reserve H2/1908

Fortress at Erkenbrand (San Jaun del Norte): Advanced = $0.  (Three year build time places completion in H2/1909) – probably installation of large caliber coastal defenses, as this is the Caribbean end of the New Beleriand Canal.


Remainder $13.83

Research:
Unspecified research (h1/1906 + h2/1906+h1/1907+h2/1907) = $2
Cavalry Tech:
1905 Advanced 5/1.5 = $1 (h2/1906+h1/1907+h2/1907)
Triple turreted 14" guns = $0.50 (h1/1907+h2/1907)
New triple turret for 12" guns = $0.50 (h1/1907+h2/1907)
New 12"/48 cal cannon = $0.50 (h1/1907+h2/1907)

Remainder $9.33

Infrustructure:
Naval:
Expanding South Mithlond Yard to Type 3 = $5 Finished
Expanding Brithombar Yard to Type 3 = $4.33 and 1 BP paid ($10.67 remaining)


Remainder $0.00
-------------------------------------------------------------------------------

Army Upkeep:

Active Units:
-----------------------------------------
8 Infantry Corp (rating of 4)
Cost: $10 upkeep 1/8: $1.25 each x8 = $10
2 Cavalry Corp (rating of 4)
Cost: $8 upkeep 1/8: $1.00 each x2 = $2
Elites:
4 Cavalry Corp (rating of 4)
Cost $8 upkeep 1/4: $2.00 each x4 = $8

Reserves:
-----------------------------------------
8 Infantry Corp (rating 4)
Cost: $10 upkeep 1/40: $0.25 each x 8 = $2
4 Cavalry Corp (rating 4)
Cost: $8 upkeep 1/40: $0.20 each x 4 = $0.80

Total Army size: 26

Total upkeep: $22.80


Naval Upkeep:

Active Fleet
---------------------------------------------
Ship or class - year laid down (Standard Displacement in tons)

Battleships:

Walda – laid down 1904 (17,565)
Freawine – laid down 1902 (17,565)
Shadowfax - laid down 1899 (15,589)
Arcadia - laid down 1899 (15,589)
Brytta - laid down 1898 (15,652)
Elfwine - laid down 1897 (15,652)
Eomer - laid down 1895 (15,625)
Theoden - laid down 1893 (13,342)
Goldwine - laid down 1894 (13,342)
Brego - laid down 1889 (11,468)
Thengel - laid down 1890 (11,468)
Gram - laid down 1891 (11,468)
Aldor - laid down 1892 (11,468)

= 185,793 tons

Coastal Battleships:

Araval - laid down 1891 (6,842)
Arveleg - laid down 1892 (6,842)
Arvedui - laid down 1892 (6,842)
Tarondor - laid down 1889 (5,829)
Tarcil - laid down 1889 (5,829)

= 32,184


Combat Cruisers:

Valandil – laid down 1906 (13,991)
Calmacil – laid down 1901 (9,324)
Romidacil - laid down 1898 (9,324)
Narmacil - laid down 1897 (9,324)
Ostoher - laid down 1896 (9,202)
Eldacar - laid down 1893 (6,928)

= 58,093 tons

Armored Cruisers:

Brethil (ex-Hill) – laid down 1892 (10,185)
Dorthonion (ex-Sherman) - laid down 1892 (10,185)
Denethor - laid down in 1887 (5,607)
Boromir - laid down in 1888 (5,607)

= 31584 tons


Belted Cruisers:

Dwimorberg - laid down 1904 (6,246)
Irensaga - laid down 1904 (6,246)
Starkhorn – laid down 1903 (6,469)
Nevrast (ex-Toothfish) - laid down 1895 (3,108)
Minas Harthad (ex-Bluefin) - laid down 1892 (4,763)
Aros (ex-Snapper) - laid down 1890 (2,198)
Ramdal (ex-Salmon) - laid down 1890 (2,198)

= 31,228 tons

Protected Cruisers:

Minrimmon - laid down 1902 (4,163)
Caradhras - laid down in 1895 (2,177)
Gundabad - laid down 1891 (1,508)
Celebdil - laid down 1891 (1,508)
Yaquina (ex-Laredo) – laid down 1891 (1,977)
Karok (ex-Torreon) – laid down 1891 (1,977)
Kusa (ex-Wilmimgton) – laid down 1891 (1,977)
Coqu (ex-Abilene) – laid down 1891 (1,977)
Kusa (ex-Socorro) – laid down 1891 (1,977)
Umpqua (ex-Tucson) – laid down 1891 (1,977)
Tenino (ex San Angelo) - laid down in 1887 (1,539)
Coos (ex Oak Ridge) - laid down in 1887 (1,539)
Yakima (ex Hull #TCC8710) - laid down 1887 (1,539)
Cowichan (ex Hull #TCC8711)- laid down 1887 (1,539)
Lillooet (ex Hull #TCC8712)- laid down 1887 (1,539)
Hoopa (ex Charlottesville) - laid down in 1887 (1,539)
Teton (ex Tyler) - laid down in 1885 (1,540)
Shasta (ex Hannibal) - laid down in 1885 (1,540)
Salish (ex Pensacola) - laid down in 1885 (1,540)
Alsea (ex Hull #TCC8510) - laid down 1885 (1,540)
Lumni (ex Hull #TCC8511)- laid down 1885 (1,540)
Nootka (ex Hull #TCC8512)- laid down 1885 (1,540)

= 39,692 tons

Destroyers:

Challenging Rabbit – laid down 1907 (765)
Falling Elk – laid down 1907 (765)
Balanced Eagle – laid down 1907 (765)
Gentle Dragon – laid down 1907 (765)
Dancing Bear – laid down 1907 (765)
Running Wolf – laid down 1907 (765)
Blue Hand – laid down 1904 (805)
Hallow Field – laid down 1904 (805)
Nia Rampage – laid down 1904 (805)
Gallant Runner – laid down 1904 (805)
War Dawn – laid down 1904 (805)
First Dawn – laid down 1904 (805)
Ramheart – laid down 1904 (805)
Middleton – laid down 1904 (805)
Shearfoot – laid down 1900 (805)
Morwen - laid down in 1895 (745)
Folcred - laid down in 1895 (745)
Folwine - laid down in 1896 (745)
Fastred - laid down in 18956 (745)
Baldor - laid down in 1896 (745)
Felarof - laid down in 1896 (745)

= 16,305 tons

Torpedo Boats:

Radburg – laid down 1902 (154)
Olwyn (ex-T23) - laid down 1891 (235)
Eogladden (ex-T24) - laid down 1891 (235)
Wídfara (ex-T26) - laid down 1891 (235)
Ceorl (ex-T27) - laid down 1891 (235)
Eledhwyn (ex-T28) - laid down 1891 (235)
Eohdwyn (ex-T29) - laid down 1891 (235)
Bereth (ex-T31) - laid down 1892 (235)
Elfhild (ex-T32) - laid down 1892 (235)
Gálmód (ex-T33) - laid down 1892 (235)
Gárulf (ex-T34) - laid down 1892 (235)
Hama - laid down 1890 (311)
Eomond - laid down 1890 (311)
Eothain - laid down 1890 (311)
Erkenbrand - laid down 1890 (311)
Hasufel - laid down 1890 (311)
Gamling - laid down 1890 (311)
Theodred - laid down 1890 (311)
Arod - laid down 1890 (311)
Meriadoc - laid down 1890 (311)
Theobrand - laid down 1890 (311)
Gamond - laid down 1891 (311)
Halas - laid down 1891 (311)
Erkenes - laid down 1891 (311)
Arodred - laid down 1891 (311)
Eoma - laid down 1891 (311)
Eowyn - laid down 1891 (311)
Gamwym - laid down 1891 (311)
Merithain - laid down 1891 (311)
Waldmond - laid down 1891 (311)

= 8,413 tons

Colliers:

Himling (ex-Generoso) - laid down 1885 (6,115)
Tolfalas - laid down 1885 (2,923)
Tol Morwen - laid down 1888 (2,923)
Tol Fuin - laid down 1889 (2,923)

Privateers:

Queen Emeraldas – laid down 1897 (7,982)
Star of Earendil – laid down 1895 (6,640)


= 14,884 tons

Total Active Fleet 427,237 tons
Maintenance: 427x2.5% = $10.68



Navy Construction:
-------------------------------------------------------------------------------------------------
Newly Budgeted Vessels of the Mark:

Windfola = $17.36
Silvertine = $7.98
Swiss Constellation = $8.20
5 x CSA Destroyers = $5

Total = $ 38.54

Under Construction:
------------------------------------------------------------------------------------------------
Rohan:

at Forlond

S2 Construction begins on Belted Cruiser Silvertine (1,042 tons delivered) 8,639 tons needed, will require 530 days to complete (finishes H2/1908) – 7,597 tons needed to complete.
S2 Construction begins on Swiss Heavy Cruiser Constellation (1,042  tons delivered) 8,570 tons needed, will require 603 days to complete (finishes H1/1909) – 7,528 tons needed to complete.
D2 idle
D2 idle

at Harlond

S2 Construction begins on Battlecruiser Windfola (1,042 tons delivered) 15,427 tons needed, will require 733 days to complete (finishes during H2/1909) – 14,385 tons  needed to complete.
S0 idle
D2 idle
D1 Construction continues on Destroyer Running Wolf (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished

at South Mithlond

S2: Construction continues on Battleship Helm Hammerhand (1,042 tons delivered) 21,522 tons needed, will require 916 days to complete (finishes during H2/1909) – 18,097 tons needed to complete.
S2: Construction continues on Battleship Fengel (1,042 tons delivered) 21,522 tons needed, will require 916 days to complete (finishes during H2/1909) – 18,097 tons needed to complete.
S3 idle
S1 Construction continues on Destroyer Challenging Rabbit (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
D2 idle

at North Mithlond

S2 Construction continues on Battlecruiser Snowmane (1,042 tons delivered) 15,427 needed, will require 733 days to complete (finishes during H1/1908) – 400 tons  needed to complete
D2 idle
D2 idle
D1 Construction continues on Destroyer Balanced Eagle (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
D0 idle

at Dol Amroth

S2 Construction continues on Destroyer Falling Elk (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
S2 Construction continues on Destroyer Gentle Dragon (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
D2 idle
D2 idle

at Pelargir

S1 Construction continues on Destroyer Dancing Bear (365 tons delivered) 731 tons needed, will require 292 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
S0 idle
D2 idle
D0 idle


New Beleriand:

at Vinyamar (Corinto)

S2 Construction continues of Combat Cruiser Valandil (803 tons delivered) 13,170 needed, will require 668 days to complete (finishes during H2/1907) – 0 tons needed to complete. Finished
S0 idle
D2 Construction begins on Destroyer CSA 1 (701 tons delivered) 701 tons needed, will require 292 days to complete (finishes during H1/1908) – 0 tons needed to complete.
D0 idle

at Eglarest (Bluefields)

S2 idle
S2 idle
D2 idle
D2 idle

at Brithombar (Puerto Cabezas)

S2-S3 Expanding
S0 idle
D2 idle
D0 idle

at Ammon-In-Gelydh (San Jaun del Sur)

S2 Construction begins on Destroyer CSA 2 (701 tons delivered) 701 tons needed, will require 292 days to complete (finishes during H1/1908) – 0 tons needed to complete.
S1 Construction begins on Destroyer CSA 3 (701 tons delivered) 701 tons needed, will require 292 days to complete (finishes during H1/1908) – 0 tons needed to complete.
D2 Construction begins on Destroyer CSA 4 (701 tons delivered) 701 tons needed, will require 292 days to complete (finishes during H1/1908) – 0 tons needed to complete.
D1 Construction begins on Destroyer CSA 5 (701 tons delivered) 701 tons needed, will require 292 days to complete (finishes during H1/1908) – 0 tons needed to complete.

12,750 tons of material used.


Ships of the Fleet: December 31, 1907 of the Sixth Age

Ship type - number in service (repair/refit/reserve) under construction (undergoing work for foreign power)

Battleships: 13 (0) 2
Battle Cruisers: 0 (0) 2
Coastal Battleships: 5 (0) 0
Combat Cruisers: 6 (0) 0 (1)
Armored Cruisers: 4 (0) 0
Belted Cruisers: 7 (0) 1
Protected Cruisers: 22 (0) 0
Destroyers: 21 (0) 0 (5)
Torpedo Boats: 30 (0) 0
Sloops: 0 (0) 0
Colliers: 4 (0) 0
Privateers: 2 (0) 0

The Rock Doctor

Could you provide an update on canal ownership?